Search
Leave a Message
Thank you for your message. I will be in touch with you shortly.
Explore Our Properties
Travertine fireplace with oak shelf, glass-railed stair, and slider opening onto a walled planting bed.

The Riverfront Trail Is Changing Under Your Wheels This August

August 13, 2026

Ride the paved stretch through Las Colonias Park over the next several weeks and you'll hit at least one underpass wrapped in caution tape, primer showing through last cycle's mural. Keep going toward downtown on a Friday night and you'll likely catch a soundcheck drifting off the Amphitheater stage before you're close enough to see it. And somewhere in between, an e-bike will pass you faster than your legs, or your kid's legs, are built to react to.

None of these three things are new to Grand Junction. What's new is that they're converging on the same six-week stretch of trail: the Amp's show nights and faster e-bike traffic are shaping rides now, while mural work is scheduled to begin later this month. Together, those changes are reshaping what a ride along the Colorado River feels like over the coming weeks.

Six Locations Are About to Change

The city's mural program, called aRT (Art on the Riverfront Trail), repaints trail underpasses every two years, and 2026 is a repaint year. The call for artists closed Wednesday, August 12, with selected muralists working between August 29 and September 30. Six locations, covering nine separate paintable walls, are up for new work this cycle: the Redlands Parkway Underpass, the Lower No Thoroughfare Underpass, the Highway 340 Riverside Underpass, the Highway 50/Fifth Street Bridge Underpass, the Monument Road and D Road Underpass, and the Ridges Boulevard Bridge near Duck Pond Park.

Each accepted artist gets a $1,000 commission per mural, and the program runs through a coalition that includes the Grand Junction Commission on Arts and Culture, the Riverfront Commission, the Colorado Department of Transportation, Mesa County Sheriff's Office, and the local collective Super Rad Art Jam. That last name matters if you've noticed the current murals at all. This is a community-run selection process, not a contractor showing up with a pre-approved design, which is part of why the walls change character every cycle instead of settling into a single house style.

For anyone who rides these six spots on a normal week, that means two things at once over the next several weeks: expect scaffolding, tape, and half-finished walls through late September, and expect the underpasses you've passed through for two years to look different by October. If you've got a favorite mural on the Redlands Parkway stretch, this is its last month standing.

The Amp Has Stopped Being a Rumor

A mile from downtown, the Amphitheater at Las Colonias Park holds up to 4,000 people, and this summer is the clearest sign yet that it's become a real regional stop rather than a nice-to-have park feature. The season opened with Turnpike Troubadours on May 22 and Brothers Osborne on June 26, then picked up pace through July with Blues Traveler and the Gin Blossoms on July 6, Wynonna Judd and Melissa Etheridge on July 9, and Lee Brice on July 17. Andy Grammer played August 2. Alison Krauss is booked for August 15, Portugal. The Man for August 19, and Ty Myers closes out the month on August 28.

That's eleven national touring acts in a single summer at a venue that didn't exist a decade ago, and it changes the rhythm of the park around it on show nights. Parking fills faster, foot traffic on the adjacent trail spikes an hour or two before doors, and sound from the stage carries down the corridor toward the Western Colorado Botanical Gardens and Watson Island on calm evenings. Some nights it overlaps with live music from the breweries that have set up near the riverfront, so a walk past Las Colonias on a Friday can mean two bands competing for the same stretch of air. If your regular loop passes through here, checking the Amp's calendar before you head out is worth the ten seconds now.

The Trail Was Built for a Slower Bike

Here's the part most casual riders haven't clocked yet. Grand Junction's paved Riverfront Trail runs more than 28 miles of connected path through the city, and under the city's own municipal code, Class 3 electric bicycles, the kind with pedal assist up to 28 miles per hour, are already allowed on it. That's not a loophole. The city's own guidance on e-bikes, scooters, and motorcycles spells out that Class 3 bikes are permitted on streets, bike lanes, city trails, and riverfront trails under Chapter 12.08 of the municipal code, while separate city e-bike resources note that Class 1 and Class 2 bikes can already go almost anywhere a standard bicycle can.

That single fact explains a lot of what regular users have been noticing this year: the trail feels faster because it legally is faster, for a growing share of the people on it. Grand Junction does not have a speed cap on the path. Montrose's city council held a first reading this month on an ordinance that would set a 15 mph limit for bikes and e-bikes on sidewalks, paths, and park trails, with a second reading scheduled for August 18. KJCT8 reported that Montrose Mayor Michael Badagliacco described the threshold as "about the right number, about the right speed that allows for safe travel". The report says the threshold was based on research by that city's police department.

For now, the rules that exist already permit the speed that's making some walkers and slower cyclists uneasy on shared sections of the path, so etiquette matters for everyone using it.

Same Six Weeks, One Path

Put those three threads next to each other and the trail's usual identity, a quiet, mostly-shaded river path good for birdwatching near Blue Heron Lake or a stop at Handlebar Tap House off the Audubon section, is getting stretched in three directions at once. It's getting a visual refresh at six specific points. It's absorbing crowds and sound from a venue that's proven it can book national acts. And it's carrying more speed than its original design assumed, while a neighboring city is debating trail speed limits.

None of that makes the trail worse. The birds are still at Connected Lakes, the zip line at Butterfly Pond still runs, and Watson Island is still a good place to stop and look at the river. But if you ride this path as part of your week rather than as a once-a-summer outing, this particular stretch of August is the moment to actually notice what's changing under your wheels instead of assuming it's the same trail it was in June.

If you're the kind of person who tracks these small shifts in the place you live, from a new mural on your commute to a faster pack of riders on a Saturday morning, you already understand something about Grand Junction that doesn't show up on a map. That's the kind of local read The Maves Group brings to every conversation about this valley, whether you're deciding where to grab coffee this weekend or wondering what a stretch like this means for a neighborhood down the line. Start Your Move with Maves whenever that conversation is ready to happen.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Follow Us On Instagram