Search

Leave a Message

Thank you for your message. I will be in touch with you shortly.

Explore Our Properties
Background Image

One Redlands Trail Got a City Crew This Spring. The Bike Park Down the Hill Got a Donation Page.

September 10, 2026

Ride out from the Lunch Loops Trailhead this month and you will pass two work zones inside the same quarter mile. One has orange cones, a paving crew, and a city budget line behind it. The other has volunteers, hand tools, and a fundraising thermometer that still needs to fill up before anyone touches a shovel.

Same trailhead. Same red rock backdrop below the Colorado National Monument. Two completely different systems deciding what gets fixed and when.

If you live in the Redlands and use this corridor to get anywhere, that difference is worth understanding, because it tells you which parts of your daily loop are guaranteed to improve on a timeline and which parts depend on whether enough neighbors chip in this summer.

The Paved Side: A Decade of Work, Finished in Spring 2025

The smooth, wide path that carries commuters, dog walkers, and stroller traffic between the Riverfront Trail and the base of the Monument is the Monument Trail, and it only became a complete loop in the last year and a half. The final three-mile segment, running from the Lunch Loops Trailhead west to Jurassic Flats along South Camp Road, was finished with a chain-breaking ceremony at the trailhead on May 20, 2025, an event that had already been pushed back once from its original May 2 date because construction ran long.

That closing stretch is what turned a set of disconnected paths into the full 10-mile Redlands Loop, linking Lunch Loops to Connected Lakes State Park, the Audubon Preserve, and the Riverfront Trail without a rider ever needing to merge onto Monument Road. Grand Junction Public Works Director Trent Prall and Colorado West Land Trust leaders Libby Collins and Rob Bleiberg spoke at the event, along with then-Mayor Abe Herman and current Mayor Cody Kennedy. The project also added Mesa County's first HAWK pedestrian signal, a beacon-style crossing that gives trail users a safe, signaled way across Monument Road instead of timing a gap in car traffic.

None of this happened quickly or cheaply. Colorado West Land Trust has been assembling the land under this loop since 2012, closing nine separate real estate transactions to conserve 213 acres along the corridor and raising more than $5 million toward acquisition and construction. The final segment alone drew a $500,000 Great Outdoors Colorado grant, on top of the $1.5 million GOCO grant that funded the earlier downtown-to-Lunch-Loops connection. That is public money, tracked through a public grant process, spent on a project with a ribbon-cutting and a paper trail.

A Separate City Program Had to Redo Part of a Nearby Trail

Here is the part that most visitors never see: even after a public trail is built to spec, it can still get torn out if enough riders complain, and it does not even have to be the same project.

Running alongside the Redlands Loop, but funded through a different city program entirely, is a multi-year effort to convert roughly 10 miles of aging asphalt trail across Grand Junction to concrete. In the spring of 2026, that resurfacing program brought crews back to a roughly 0.3-mile stretch of the Redlands Parkway Trail near the Blue Heron Boat Ramp, where 24 Road becomes Redlands Parkway. That section had first been converted from asphalt to concrete in 2023. The concrete met the project's specifications. It just did not ride well.

"We received feedback from the community that the rideability could be better. There were some wavy parts of that stretch and so we ultimately decided that it was in the best interest of the public to replace it."

That is Kelsey Coleman, the city's Communications and Engagement Manager, explaining why crews spent an estimated $100,000 in materials tearing out and repouring a section that technically passed inspection. Work began the week of April 28, with cyclists detoured onto the striped bike lane along Redlands Parkway to the Blue Heron Boat Ramp entrance while the concrete cured. The city expected the section to reopen by the end of May.

There is a small postscript worth knowing if you are the type who tracks municipal equipment auctions: once this stretch was done, the city planned to sell off the specialized concrete-laying machine it had bought for the asphalt-to-concrete program, since the broader 10-mile conversion effort across the city was wrapping up. In other words, this repair was not the start of more trail construction through the Redlands. It was closer to a final cleanup pass on a citywide program that is otherwise finished.

Down the Hill, a Different Kind of Fix

Walk or ride past the paved loop and down into the Lunch Loops Bike Park, the skills area tucked at the base of the technical singletrack network, and you are looking at a project running on an entirely different clock.

The bike park had not been meaningfully rebuilt in about a decade, and it showed. According to Faith Rodriguez, Executive Director of the Colorado Plateau Mountain Bike Trail Association, the original build had been done on a tight budget and its jump features leaned more toward BMX riding than the mountain bike crowd that now dominates the trailhead. A community survey COPMOBA ran turned up a clear ask: more jumps, more skills-based features, built for the bikes people are actually riding.

The organization brought in Spencer Rugland, a local rider and owner of Thunderbird Trail Works, to lead the rebuild. Phase one, a $10,000 dual slalom course, is already open and got its first organized event this summer when COPMOBA and the Grand Valley Youth Cycling Club hosted a session on it. The larger phase, four new jump lines split between two blue and two green difficulty ratings with wood features built in house, is scheduled for this fall.

Whether that fall build happens on schedule depends on money that has not all arrived yet. COPMOBA has committed $85,000 to the project, split between a $35,000 down payment and a $50,000 matching pledge, but the remaining balance is coming from community fundraising rather than a government grant. As of this summer, the organization was still raising funds with the goal of finishing the build once the season turns.

Why the Split Matters If You Actually Use This Trailhead

The Lunch Loops Trailhead is not a quiet corner of the Redlands. COPMOBA's own count put visitation at roughly 227,000 people last year, making it one of the busiest recreation hubs in Mesa County. That volume is exactly why the two funding tracks matter so much to someone who rides or walks here regularly.

The paved Redlands Loop, the HAWK crossing, and the separate Redlands Parkway resurfacing program all sit inside a public accountability structure. Different city budgets and grant sources fund them, but both are built under contract and both are apparently fixable through a phone call or a public comment if enough neighbors report a problem, which is precisely how the wavy concrete stretch got redone months after it was declared finished. If something along either paved corridor is genuinely unsafe or unusable, there is a documented channel for getting it addressed.

The bike park works differently. It is real infrastructure, serving real demand, but it exists because a nonprofit and a volunteer trail builder decided to take it on, and because enough locals are expected to donate the rest of the way. There is no guaranteed budget line waiting to finish those jump lines if fundraising falls short this summer. The four features slated for fall could slip into next year, or scale back, depending on what comes in.

If you are trying to plan around either project this season, the practical version looks like this:

  • The paved Redlands Loop itself has been complete and open since its May 2025 chain-breaking ceremony, with no further construction expected on that segment.
  • The Redlands Parkway Trail near Blue Heron Boat Ramp, resurfaced under the city's separate asphalt-to-concrete program, should be back to full width and smooth surface following its spring 2026 repair.
  • The Lunch Loops Bike Park's dual slalom course is open now and ready to ride.
  • The four new jump lines are targeted for a fall 2026 build, but the timeline is tied directly to how quickly COPMOBA closes the gap on its remaining fundraising need. If you want to support that build, COPMOBA is the organization to donate through directly, since the city is not a funding partner on that piece.

Two systems, one trailhead, two very different ways to get something fixed. Knowing which is which saves you the trouble of calling the wrong number when a trail needs work.

The Redlands keeps proving that its outdoor spaces are not static amenities sitting in the background of daily life. They are actively managed, actively argued over, and actively rebuilt, sometimes by the city and sometimes by the neighbors who show up with shovels and donation links. If you want that kind of ground-level read on what is actually changing in this part of the Grand Valley, Kelly Maves tracks it the way a local should, one trailhead at a time.

Follow Us On Instagram